Detailed examination of a fuel depot and preservation of evidence
Location |
Iran |
Period of execution |
2012 |
Project descriptionThe fuel depot was built on fallow land and put into operation in 2010. During construction and operation, there were minor incidents which caused oil leakage. To explore the current state, a detailed examination was conducted.
To minimize future risks, the whole depot area was evaluated for opportunities of improvement. The local operating staff has been trained to perform simple groundwater investigations. |
|
Services provided by BfU
|
|
![]() |
![]() |
![]() |
![]() |