Remediation of a BTX-groundwater contamination by Air-Sparging
Location |
Nuremberg, Germany |
Period of execution |
2008 - 2013 |
![]() Project descriptionIn the course of a pilot test, Air-Sparging measures were run to remediate a BTX contamination for 3 months. The attempt was successful (discharge of pollutants > 200 kg), leading to the implementation on the entire premises |
|
Services provided by BfUPlanning and building the well system; Planning and calling for bids for the required system engineering, expert supervision and evaluation of the pilot test and the remediation measures; Sampling of soil air and groundwater; Mass flow calculations; Presentation of results to authorities for approval planning |
|
![]() |
![]() |